Bued Sand and Gravel Project PDF Print E-mail
VINC VITA acquired  816.93 hectares or 10 mendional claims to be host for its proposed sand and gravel requirements for the Pier with the latest state-of-the Art Port Facilities.

Guaranteed 5-10 year contracts on Asian companies engaged in the construction industry to supply sand and gravel from the BUED Riverbeds.

Simultaneously a flood control intervention project of the Bued River.

Continuous flow of water and the blossoming of marine life during project implementation.

 
< Prev   Next >
  • Aims to accommodate bulk ship carriers with 60,000 MT capacities or Handimax-sized vessels with reliable electricity source.

    Eventual expansion to Panamax-sized vessels

    Port Terminal to be constructed by VINC VITA to deliver coal and cement to our customers all over the world shall be equipped with modern facilities, were houses and mobile installations to optimized deliveries.
    Read more...
  • VINC VITA acquired  816.93 hectares or 10 mendional claims to be host for its proposed sand and gravel requirements for the Pier with the latest state-of-the Art Port Facilities.
    Read more...
  • VINC VITA owns 102 mining claims and propriety to 7,371 hectares of limestone and shale in Bolinao, Pangasinan, The proposed location of the cement plant project.

    BHP Australia confirmed that mine deposits could  support 3.0 Million MTPY cement production for 130 years.


    Read more...

Copyright © 2009. VINC VITA Mining Corporation. All rights reserved.